Refurbishment & Extension Projects
New Cavendish Street, W1W 6XL, Contract: Traditional
Description: Flat refurbishment
Duration: 3 months
•
Lydon Road, SW4, Contract: Traditional with Contractors Design Portion
Description: Extension and refurbishment of a Victorian terraced property
Duration: 9 months
•
Albert Bridge Road, SW11, (Repeat Client) Contract: Traditional
Description: Roof extension
Duration: 2 months
•
Albert Bridge Road, SW11, (Repeat Client) Contract: Traditional
Description: Third floor rear extension
Duration:2 months
•
Clifton Gardens, W9, Contract: JCT
Description: Structural remodelling and refurbishment of 3rd & 4th floor flat.
Duration: 6 months
•
Elm Gardens, N2, Contract: JCT
Description: Extension & refurbishment throughout of an Edwardian property.
Duration: 5 months
•
Norroy Road, SW15, Contract: JCT
Description: Refurbishment and repair of a Victorian townhouse.
Duration: 4 months
•
Garrick House, W1J, (Repeat Client) Contract: JCT
Description: Remodelling & refurbishment of a 5th floor flat with limited access.
Duration: 9 months over 2 phases
•
Swanley Bar Lane, EN6, Contract: JCT
Description: Ground floor refurbishment of a semi detached property.
Duration: 3 months
•
Dover Park Drive, SW15, Contract: JCT
Description: Ground floor refurbishment of a detached property.
Duration: 3 months
•
St Stephens Gardens, W2, Contract: JCT
Description: Flat refurbishment.
Duration: 3 months
•
Abbotsbury Road, W14, Contract: JCT
Description: Rear extension and refurbishment throughout of Holland Park. townhouse.
Duration: 11 months
•
The Crescent, BR3, Contract: JCT
Description: Ground floor refurbishment and rear extension. Polystorm Lite system installed for rear rainwater. Owner in residence during works.
Duration: 4 months
•
Bramham Gardens, SW5,
Description: Refurbishment of flat & integration into flat below. Owner in residence during works.
Duration: 4 months
•
Oxberry Avenue, SW6, Contract: JCT
Description: Kitchen & bathrooms refurbishment. Owner in residence during works.
Duration: 5 months
•
Albert Bridge Road, SW11, Contract: JCT
Description: Refurbishment throughout of a 5 storey townhouse.
Duration: 5 months
•
Trinity Road, SW19, Contract: JCT
Description: Extensive structural and extension of a Victorian villa. Rainwater harvesting system.
Duration: 10 months
•
Cranley Gardens, SW7, Contract: JCT
Description: Refurbishment of a Grade 2 Listed flat
Duration: 4 months
•
Scarsdale Villas, W8, Contract: JCT
Description: Complex structural alteration to lower ground floor & garden including underpinning
Duration: 8 months
•